The boiler of no. 182 outside the Engine Shed in October 2004, about to be reunited with the frames. It had just passed its hydraulic pressure test: 30 minutes at 240 p.s.i. (normal working pressure is 160 p.s.i.).
Back
Coleford Home
Menu
Next